PROJECTS IN PROGRESS
Capital Improvement Projects
Airport
Public Facilities
Sewer
Storm Drains
Streets
Water
SEWER
Lift Station No. 10
The mechanical system on this lift station is being upgraded by
John Madonna Construction. Pumps have been ordered with expected
delivery end of August 2010 and completed installation by the
end of the year.
Mechanical Bar Screens
The mechanical bar screens at the Wastewater Treatment Plant are
being upgraded. The project was awarded to Spiess Construction
and the equipment will be provided by Parkson. The bar screens
are being manufactured with delivery expected by the middle of
August and installation shortly thereafter.
Paso Robles Sewer and Lift Station No. 5
The sewer in Paso Robles Street at 13th Street and Lift Station
No. 5 are being upgraded. The project is being designed by
Cannon in San Luis Obispo. Construction bids are expected to be
advertised in late 2010.
Potholing Utilities for Sewer Upgrades
Bids are currently being solicited to pothole existing utilities
for the final design of sewer upgrades at various location. The
pothole information will be used to perform final design as
follows:
Riverside/2nd/15th - design by North Coast Engineering
Oak Park area - design by Cannon
Sewer Main Rehabilitation
Old sewer lines at various locations in the City will be
upgraded and lined to extend their useful life. The project is
currently underway with the contract awarded to MGE Underground.
Work should be completed by the end of 2010.