Dec 28

Airport Pipeline Infrastructure (DPW 17-19A)

Posted on December 28, 2018 at 2:46 PM by Caryn Jackson

This photo attached is of current waterline installation in Dry Creek Road (DPW 17-19A).

Continue Reading...

Tag(s): pipeline, airport, 17-19A

Nov 20

Roadwork on 12th Street - Fresno to Merry Hill (DPW 17-17)

Posted on November 20, 2018 at 2:52 PM by Caryn Jackson

https://www.prcity.com/DocumentCenter/View/24149/DPW-17-17-September-7-2018-update
Paving repair has been completed, and the contractor is finishing up with raising the utility covers and placing the AC Berms along the sides to control the drainage (9-7-2018).
Sep 04

Vine Street Improvements - 32nd to Caballo Pl. (DPW 12-12J-1)

Posted on September 4, 2018 at 11:33 AM by Caryn Jackson

August 31, 2018 Update (PDF)
Waterlines, streetlight conduits, and the gas mains have been installed. Concrete curbs, gutters, and ramps are complete. Contractor is performing the grading of the road to create the sub-grade foundation (8-31-2018).