Airport Pipeline Infrastructure (DPW 17-19A)

Posted on January 23, 2019 at 11:03 AM by Shonna Howenstine

Airport PipelineThis photo and the attached information is of current waterline installation in Dry Creek Road (DPW 17-19A). Sewer pipes are also planned to be installed in Dry Creek Road. The Traffic Control noted on the PDF (below) is only when the  Contractor is working. Dry Creek Road is FULLY open at the end of the day and during weekends.

Once all the pipelines are complete, the surface of Dry Creek Road will be repaired and slightly widened (from a width that varies in range from about 16-20 feet wide "rough edges" to a more consistent 24-feet wide pavement with hard edge).

View Photos: DPW 17-19A Airport Pipelines Status Update (PDF)

Tag(s): pipeline, airport, 17-19A