Jul 20

Spring Street - 24th to 36th (DPW 12-12F-4)

Posted on July 20, 2018 at 7:20 AM by Briana Reardon

The project is in the design stage, and will feature the following items:

  • Address drainage deficiencies.
  • Install conduit for future fiber optics line.
  • Remove and replace deteriorated asphalt (full width) from 24th to 36th
  • Repair damaged curbs, gutters, and sidewalks.
  • Upgrade old sewer mains and replace old manhole covers.
  • Upgrade old and undersized water mains to meet fire flow demand.

Construction schedule: Summer 2019