The original item was published from July 20, 2018 6:26 AM to July 24, 2018 10:41 AM
Updates
-
July 10, 2018 (PDF)
Foundation for the signal poles have been drilled and concrete placed, rebar cage for the remaining signal pole foundation and new sewer pipelines are in process.
-
June 21, 2018 (PDF)
Work on Sherwood Road is continuing. The “missing” curbs, gutters, and sidewalks across from Food-4-Less are 70% completed.
-
May 25, 2018 (PDF)
The first phase of the work is to upgrade deteriorated concrete sidewalks and gutters.
-
May 1, 2017 (PDF)
Final design for the repair of Sherwood - Creston to Linne has began so that it can be in construction by 2018 per the adopted list of streets schedule using Supplemental Sales Tax. Last week, soils engineers were on-site to perform drilling of the existing roadway. The data from the borings will be used to establish the final street structure that will be needed for the road repairs. A few weeks ago, construction surveyors were also on-site to gather field data survey to be used for the final design as well.
Project will feature the following items:
-
Complete the missing curb, gutter, and sidewalk at the corner across from Food-4-Less.
-
Improve and resurface deteriorated asphalt.
-
Install a landscaped raised median.
- Install a new traffic signal at Commerce.
- Install additional street trees along the south side.
-
Install decorative streetlights.
-
Stripe and paint the bike lanes.
- Upgrade the old sewer pipes between Commerce and Linne.
Funding
Please note that funding for the project are from a combination of: