The original item was published from July 20, 2018 6:28 AM to July 20, 2018 7:19 AM
This is the dirt area behind the Georgia Brown School. The project is in the design stage, and has the following features:
- Grade and pave the dirt area with new asphalt.
- Lowering of a shallow existing water main.
- Upgrade the curb ramps at 32nd and at Arlene.
July 13, 2018 (PDF)
Lowering the water mains is 80% complete. Contractor will start grading for curb ramps, sidewalks, and trenching for streetlight conduits next.
June 21, 2018 (PDF)
Construction has begun to pave the dirt area of Vine Street, behind Georgia Brown Elementary School.
May 5, 2017 (PDF)
The design work has begun with the field work to drill for soils data and perform infiltration test.