Do I need a permit to build a patio cover or to enclose my patio?

Patio covers are considered structures and do require a building permit. In a single-family zone, if the patio is open on at least two sides the cover may encroach into the required setbacks as specified by Chapter 21.16I.220 of the Zoning Ordinance. An existing patio that is enclosed with any type of screen, shadecloth, lattice, or any other material is considered a part of the building and is subject to the same setback restrictions as the main building. Contact the Planning Division at 805-237-3970 for more information.

Show All Answers

1. When is a permit required?
2. When do I have to apply for a sign permit?
3. When do I need to apply for a building permit?
4. Can I build a shed in my back yard or add on to my house?
5. How big can a detached accessory building be?
6. Where can I find off-street parking requirements?
7. Where can I find traffic counts for the City of Paso Robles?
8. What does PD mean?
9. Where can I find water and sewer information for a specific piece of property?
10. How do I find out what can be built or what types of uses would be permitted on a certain piece of property?
11. How do I find out the zoning on a parcel?
12. What are the height requirements for fencing?
13. How do I determine where my property line is?
14. How do I determine what my setbacks are?
15. When is the installation of offsite (curb, gutter, sidewalk) improvements required?
16. Do I need a permit to build a patio cover or to enclose my patio?
17. How do I determine what my setbacks are for a swimming pool?
18. Where can I park a motor home on my single-family residential property?
19. How can I find out about a pending project I have heard about?
20. May a nonconforming use be re-established in the event of fire or other natural disaster?
21. When do I need a business license / home occupation permit?